Store the corrugated cartons and paper-fiber insulation in a clean, dry area before packing. Keep fiber components away from direct water exposure unless the approved project specification includes suitable moisture protection.
Pre-condition the payload and coolant according to the packout plan. Install the base and side insulation completely, then position the product, liquide de refroidissement, dividers and any liner so that freeze-sensitive items do not touch frozen packs directly.
Fit the fiber lid without leaving large gaps and close the carton with the specified tape pattern. Apply perishable, orientation or temperature-handling labels required for the route.
The shipper provides insulation but does not create cooling by itself. Actual temperature duration depends on the full system, y compris la charge utile, masse de liquide de refroidissement, épaisseur du panneau, ambient conditions and handling. Validate representative shipments before routine use.
If dry ice is being considered, confirm material compatibility, ventilation, dangerous-goods marking and carrier acceptance before use.